From: Confounding and missing data in cost-effectiveness analysis: comparing different methods
DSQ, immature defence styles | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
DSQ <4 (N=93) | DSQ ≥4 (N=100) | |||||||||
Variable | Month | Mean a | SD b | NZ c | NM d | Mean a | SD b | NZ c | NM d | |
GSI | 3 | 0.85 | 0.51 | 7 | 1.19 | 0.55 | 11 | |||
GSI | 7 | 0.70 | 0.48 | 14 | 1.08 | 0.60 | 19 | |||
GSI | 9 | 0.64 | 0.45 | 10 | 1.02 | 0.63 | 22 | |||
GSI | 12 | 0.65 | 0.51 | 13 | 1.01 | 0.62 | 21 | |||
AUC of Eff | 3–12 | 0.51 | 0.31 | 18 | 0.8 | 0.39 | 30 | |||
Costs | 0–3 | 735 | 251 | 0 | 9 | 832 | 313 | 0 | 15 | |
Costs | 3–7 | 689 | 309 | 1 | 9 | 802 | 627 | 1 | 15 | |
Costs | 7–9 | 185 | 259 | 38 | 9 | 234 | 309 | 31 | 19 | |
Costs | 9–12 | 186 | 345 | 41 | 9 | 238 | 473 | 37 | 20 | |
Cumul. costs | 0–12 | 1818 | 809 | 0 | 12 | 2131 | 1323 | 0 | 21 |